A manufactured building system has a pair of pre-stressed multi-stemmed concrete floors. The pre-stressed multi-stemmed concrete floors are adapted to contact each other on one parallel side edge to form peripheral edges and a central joining edge. A part of a building is coupled to a pre-stressed multi-stemmed concrete floor. Also described is a Method of Transporting the pre-stressed multi-stemmed concrete floors with the partial building coupled there to, to a site. Also described is a Method of Manufacturing a pre-stressed multi-stemmed concrete floor.
RELATED APPLICATION
The present application is a division of application U.S. Ser. No. 10/677,773 filed Oct. 2, 2003 now U.S. Pat. No. 7,021,014 entitled Manufactured Building System and Method of Manufacture and Method of Transport.
The present invention relates to a transport device for transporting a building. The device includes a first support structure, the first support structure having at least four wheels capable of individual rotation about a vertical axis and a second support structure, the second support structure having at least four wheels capable of individual rotation about a vertical axis. The first support structure and the second support structure are configured to couple together to support and transport the building.